Sr. No. | Name of the Work | Name of the Client | Year of Completion |
1 | C/o. Resdl.Qrs. For Customs Deptt. At Nhava-Sheva. (Ph-1) | Central Public Works Department Mumbai | 30.11.1997 |
2 | Construction of new Divisional workshop with its sub works at Kalwa in Thane Division. | Maharashtra State Road Transport Corporation | 10.02.1998 |
3 | Construction of ped, subway and service ducts at Mansarovar Rly Stn. | Dy. Chief Engineer (C) Central Railway |
30.11.1998 |
4 | Extension of heavy repair shed & light repair shed at Sanpada Carshed | Dy. Chief Engineer (C) Central Railway |
30.11.1998 |
5 | Balance left over work of Construction of Commuter subways, etc at Udyamnagar (Thane end) Rly. Station for Thane-Turbhe Rly. Project, Vikasnagar (Thane End) & Udaymnagar (Turbhe End) Railway Station. | Dy. Chief Engineer (C) Central Railway Juinagar |
10.04.2000 |
6 | Kurla 4th Terminus Phase II Stage II- Construction of two nos. washing cum pit line with apron and conversion of existing teo pit lines and washable apron on platform line No. 4 | Dy. Chief Engineer (C) Central Railway Dadar |
31.10.2000 |
7 | Casting and Transporting to bridge site present PSC/RCC Slab including ballast retainer upto 6.10 Mtr Span for various bridges between Gomta-Keshod stations in connection with Gauge Conversion of Rajkot-Veraval Gauge Conversion Project. | Dy. Chief Engineer (C) Western Railway Rajkot |
31.12.2001 |
8 | Construction of inspection shed and ancillary building at Sanpada carshed | Dy. Chief Engineer (C) Central Railway |
30.04.2002 |
9 | CSTM-Remodelling of main line complex-C/o. washing cum pit lines with elevated platforms involving RCC/PCC structures with services such as water supply/ drainage works at Wadibunder goods Yard | Dy. Chief Engineer (C), Dadar, Mumbai | 25.07.2002 |
10 | Construction of High Level Platforms, Cover Over Platforms, road circulating area and other misc. works at Chikhale, Mohope & Chowk, stations on Panvel-Karjat new BG Rly Line | Chief Engineer (C), North Central Railway, Mumbai |
10.08.2003 |
11 | Construction of Minor Bridge from Ch-1040 to 38377m in Kurduwadi to Pangri Section of KWV-LUR GC Project | Dy. Chief Engineer (C) – II Central Railway Solapur |
06.11.2003 |
12 | Construction of Road Over Bridge at Ch: 10614.70m & Ch:12012.55m on Panvel-Jasai-JNPT Doubling section | Dy. Chief Engineer (C), Central Railway, Kalyan |
31.05.2006 |
13 | Construction & extension (strengthening) of 6 x 6.10m slab bridge at 36.289, 1x 3.05m slab bridge at Ch.35.351 and 1 x 6.10m RCC box at 292.50m in connection with Nerul-Belapur-Seawood-Uran Railway project | Dy. Chief Engineer (C) Central Railway Juinagar |
30.10.2007 |
14 | Lokmanya Tilak Terminus Kurla – Construction of 3 Nos. Washing Cum Pit Line 600m long, one platform line on washable apron and one platform with cover over including services such as water supply and drainage arrangements | Dy. Chief Engineer (C), Central Railway, Dadar |
15.06.2008 |
15 | Providing rail tracks for proposed 16 Ton Capacity ELL wharf cranes at Berth nos. 2, 3 & 4 of Indira Dock including its Pile foundation | Mumbai Port Trust Mumbai |
23.01.2010 |
Sr. No. | Name of the Work | Name of the Client | Year of Completion |
1 | Transportation of PSC Sleepers such as line sleepers, Points & Crossing sleepers, SEJ’s sleepers, LC sleepers & Bridge approaches sleepers etc. from various sleeper factories to Pratapnagar – Chhotaudepur section along the track including Yards in connection with gauge conversion of Pratapnagar – Chhotaudepur section of Western Railway | Dy. Chief Engineer (C) Western Railway Vadodara |
31.03.2010 |
2 | Earthwork & track work for Construction of new stabling sidings at Thakurli, Ambernath, Vangani and Karjat Stations in Mumbai Division | Dy. Chief Engineer (C) Central Railway Juinagar |
15.06.2010 |
3 | Laying and linking of Broad Gauge main line (BG) loops, including (BG) Points and crossings at Somnath station yard | Dy. Chief Engineer (C) Western Railway Rajkot |
31.03.2008 |
4 | CST-Mumbai-Remodeling of main line complex P.way work in connection with Remodeling of Wadi Bunder Yard and Mazgaon Yard | Dy. Chief Engineer (C), Central Railway Dadar |
26.12.2006 |
5 | Construction of Railway Siding including supply of Rails, PSC Sleepers, Points & Crossings, SEJ & all other P.way material for GTI at JNPT | Gateway Terminal of India Ltd., JNPT |
31.05.2006 |
6 | Development of paved area for reach stacker specification and providing RMGC Rails for Rail No. 6 & 8 at JNPT Port | Jawaharlal Nehru Port Trust, Nhava- Sheva |
31.12.2005 |
7 | Strengthening for Railway Track in the Marshalling Yard area at NMPT | New Mangalore Port Trust, Mangalore |
23.11.2005 |
8 | Laying & linking of new BG rack between Ch. 000 to Ch. 9200m and other track linking works on Panvel-Karjat New Rail line. | Dy. Chief Engineer (C) Central Railway, Panvel |
09.01.2004 |
9 | Up-gradation of MbPT Railway Tracks between Wadala & Ballard Pier | Mumbai Port Trust Mumbai |
16.04.2004 |
10 | Laying of new rail track C/o. Rly formation drain bridge, P.way & linking works & renovation work at 270MW BCPP along with supply of Rails, PSC Sleepers, Points & Crossings | Bharat Aluminium Co. Ltd. Korba, Chhattisgarh |
15.01.2004 |
11 | Linking of double track including supply of minor track fitting and other misc. work from Ch. 3000 to 57000m on Talvadiya-Khirkiya Main Line Diversion Project | Chief Engineer, Central Railway Mumbai |
12.09.2003 |
12 | Civil and track work of Railway siding at ACC Tikaria Plant | The Associated Cement Co. Ltd. Raipur | 24.11.2002 |
13 | Railway siding and other interconnected Ancillary works at Sikka unit of Gujrat State Fertilizers & Chemicals Ltd. | UHDE INDIA LTD Mumbai |
30.10.2001 |
14 | Linking of BG Track with 52Kg / 60Kg T-12 Rails on Monoblock Concrete sleepers and Points and Xing on Wooden sleepers in Turbhe-Sanpada and Vashi Chord line Project | IRCON International Limited Navi Mumbai |
09.02.1998 |
15 | Design & Construction of RCC Stron Water Drain in Chemical Storage Terminal in J. N. Port | Jawaharlal Nehru Port Trust Nhava-Sheva |
20.04.1998 |
16 | Linking and laying about 2300Mtr railway track line alongwith supply of all track materials such as Rails, MBC Sleepers and other accessories with turnouts. Check rail and civil works etc. complete | Jawaharlal Nehru Port Trust Nhava-Sheva |
25.03.1997 |
17 | Linking of 16 Kms of railway track on our Nhava – Sheva | Nhava – Sheva Port | 30.03.1998 |